back to top

Upgrading to an epoxy floor shouldn’t be a mystery. At PalmGuard Epoxy, we follow a proven, six-phase system that delivers a peel-proof finish in as little as 24 hours. Whether you’re coating a 200 sq ft single-car garage in Tampa or a 1,200 sq ft showroom in Clearwater, the workflow stays the same—transparent, efficient, and backed by our lifetime adhesion warranty.


Phase 1 — Free On-Site Quote & Moisture Test

  1. Concrete inspection: We measure cracks, existing coatings, and slab hardness.
  2. Digital moisture reading: In-slab RH probe identifies vapor levels (> 75 % RH triggers a moisture-vapor barrier).
  3. Color & texture design: Choose flake blend, metallic pigment, or quartz.
  4. Detailed written quote: Itemized scope, square-foot pricing, and projected install date.

Typical timeline: 30-minute visit. You receive the quote within 24 hours.


Phase 2 — Surface Prep & Crack Repair

Step Why It Matters Equipment
Diamond grinding (CSP-2/3) Creates mechanical profile for maximum bond 21” planetary grinder + HEPA vac
Crack & joint filling Prevents telegraphing and moisture seepage Fast-set polyurea filler
Oil & silica wipe-down Removes contaminants that cause delamination Industrial degreaser + microfiber

Proper prep is the #1 reason PalmGuard floors outlast DIY kits and many competitors.


Phase 3 — Primer / Moisture-Vapor Barrier

  • 100 % solids epoxy primer penetrates the open pores and seals micro-cracks.
  • MVB epoxy is applied when RH levels exceed 75 %—critical for Florida slabs.
  • Cure time: 30–60 minutes (fast-dry formula).

Phase 4 — Build Coat & Decorative Layer

Flake Systems

  • Pigmented build coat rolled at 10–12 mils.
  • Full broadcast of vinyl flakes for color, camouflage, and slip texture.

Metallic Systems

  • Self-leveling epoxy infused with metallic pigments for 3-D depth.
  • Artistic swirling technique ensures a one-of-a-kind finish.

Phase 5 — UV-Stable Polyaspartic Clear Coat

  • Applied at 10–12 mils for chemical and hot-tire resistance.
  • Optional aluminum-oxide grit meets OSHA slip standards for pool decks and entryways.
  • Touch-dry in 60 minutes; light foot traffic at 4 hours; vehicle traffic after 24–48 hours.

Phase 6 — Final Walk-Through & Lifetime Warranty

  1. Client inspection: Verify gloss, color, and uniform flake coverage.
  2. Maintenance kit: pH-neutral cleaner + microfiber mop.
  3. Digital warranty: Lifetime adhesion guarantee emailed same day.
  4. Before/after photos: Added to our Facebook portfolio (https://www.facebook.com/palmguardepoxy) for proof of craftsmanship.

Typical Install Timeline (400 sq ft Garage)

Day Task Hours on-site
Day 1 AM Grind, crack repair, moisture test confirmation 2–3 h
Day 1 PM Primer + build coat + flake/metallic layer 2–3 h
Day 2 AM Clear coat + walk-through 1–2 h
Drive-on After 24–48 h cure

Why Tampa Bay Homeowners Choose PalmGuard Epoxy

  • Lifetime adhesion warranty—no peeling, no flaking, guaranteed.
  • Fast 2-day turnaround even in high humidity, thanks to polyaspartic chemistry.

Ready to experience the PalmGuard difference? Click “Get Quote” or call (813) 364-4584 to lock in our $899 Summer Garage Special before July 4ᵗʰ.

Trusted Epoxy Flooring & Coating Experts in Tampa Bay

At PalmGuard Epoxy, we deliver long-lasting, chemical-resistant, and low-maintenance epoxy floors across Tampa, St. Petersburg, and Clearwater. Whether it’s a garage, commercial space, or boat deck, our coatings are built for Florida’s climate and your lifestyle.

Durable Flooring

Three Year Warranty

Categories: Residential

Leave a Comment